Pre-Inspection Briefing
INTERACTIVE PRESENTATION
Proposed Inspection Plan
- Tuesday, [Date]
- 5:00 PM - Start of Inspection
- Wednesday, [Date]
- 8:00 AM - Arrival, sign in, and badging
- AM - Plant Safety Refresher
- AM - Walking Tour of UDOC Plants
- 12:00 PM - Lunch
- PM - Plant(s) Inspection, Declaration review
- 5:00 PM - End of Inspection
- 6:00 PM - Leave Site
- Thursday, [Date]
- 8:00 AM - Arrival, sign-in, and badging
- AM - IT Preliminary Findings (PF) writing review
- 12:00 PM - Lunch
- PM - IT PF writing, PF review, sign PF
- PM - Leave Site, return to point of entry (Dulles, VA)
Slide Thirteen
At the conclusion to the pre-inspection briefing, it is beneficial to propose an inspection plan for consideration by the inspection team during the development of their plan. Although not required by the CWCR, a proposed inspection plan often assists the inspection team in taking into account operational considerations of the plant site. The AT will assist you in the creation and presentation of a site-specific proposed inspection plan.